Section 9: Other observations
consolidated text (as at 2013, amended since). juris shows the text as it was consolidated; it does not confirm that this is the law in force today.
9. Other observations
I certify that on ..................................... I thoroughly examined the steam receiver
described above including its fittings and that the above is a true report of my
examination.
Signature of registered boiler inspector: ..............................................................
Name: ............................................................................................................
Address: ........................................................................................................
Tel No.: ..............................................
Date: .................................................
EIGHTH SCHEDULE
[Section 59]
THE OCCUPATIONAL SAFETY AND HEALTH ACT
[Section 59]
REPORT OF EXAMINATION OF AN AIR RECEIVER
PART I