5. Amendment of Schedule The Minister may, by regulations, amend the Schedule. SCHEDULE [Section 3] The link bridge shall be— (a) at a distance of about 237 metres from the bridge over Feeder Boname on the Réduit Road B1 and have 2 columns located to the east of the road and placed at a distance of at least 4 metres from the edge of the existing road; (b) at a minimum height of 5 metres above the Réduit Road B1; (c) of such construction and design as the Minister may approve. [Issue 1] U8 – 2