Section 4: Exemption from requirement for permit

Building Control Act 2012Section 4

4. Exemption from requirement for permit (1) No permit shall be required for building works relating to – (a) a gate, hoarding or boundary wall not higher than 1.8 metres, other than – (i) one which borders a road; or (ii) an enclosure crossing, or standing within 2 metres of, a watercourse; (b) a single storey trellis, pergola or gazebo; (c) a canal or drain not more than 300 millimetres deep; (d) a temporary stall or shed of lightweight material within any premises used for the purpose of holding a trade fair, a fun fair, or an exhibition, lasting not more than 6 months; (e) the demolition, restoration or reinstatement of a non-load bearing wall; (f) the replacement or changing of windows or doors in a building not exceeding 2 storeys; or (g) the replacement of existing floor and wall finishes. (2) Nothing in subsection (1) shall exempt any person from complying with the other requirements of this Act. PART II – BUILDING CONTROLADVISORY COUNCIL

Start date not held: comes into operation on a date fixed by Proclamation, and juris holds no Proclamation for it.

as enacted (not consolidated). juris shows this Act from a copy that is not the official consolidation, so it may not carry every amendment; the amendments juris holds are listed. It does not confirm that this is the law in force today.

Ask juris about this section Official source