Cadastral Survey Act 2011Section 12
12. Survey to be approved by Chief Surveyor
(1) A land surveyor shall, on completion of a survey of a plot of
land, deposit his memorandum of survey or survey report and plan, together
with such survey dataset as may be required, with the Chief Surveyor.
(2) The Chief Surveyor shall verify whether the survey has been
carried out in the prescribed manner and the memorandum of survey or
survey report and plan have been drawn up and made in the prescribed form
and manner.
(3) Where the Chief Surveyor is of the opinion that a survey –
(a) has not been carried out in the prescribed form and
manner, or that the memorandum of survey has, or
survey report and plan have, not been drawn up and
made in the prescribed form and manner, he shall
require the land surveyor to amend his memorandum of
survey, survey report or plan, as the case may be;
(b) has been carried out in the prescribed form and manner,
or that the memorandum of survey has, or survey report
and plan have, been drawn up and made in the
prescribed form and manner, he shall approve the
memorandum of survey or survey report and plan, as
the case may be.
22_The Cadastral Survey Act 2011:bill_template_v6.qxp 7/16/11 9:32 AM Page 409
Acts 2011 409