Construction Industry Authority Act 2023Section 129
129. Protective measures from dangerous or
ruinous building
(1) Where the report under section 128(2)
specifies that a building or wall is in a dangerous or
ruinous state, the local authority shall cause a notice to
be served in accordance with section 154A on its owner
or occupier, ordering that, within such time as may be
specified in the notice –
(a) the building or wall be shored up
or otherwise secured, and proper
hoardings or fence be put up for the
protection of passers-by;
(b) the building or wall be forthwith
pulled down, secured or repaired; or
746 Acts 2023
(c) the building be vacated.
(2) The local authority shall –
(a) where a notice sent by registered
post on the owner or occupier
returns undelivered and personal
service of the notice could not be
effected on the owner or occupier
by the local authority, cause
substituted service –
(i) by affixing a new notice to
the owner’s or occupier’s last
known residence or business
address;
(ii) by affixing a copy of the
new notice to the building or
wall; and
(iii) by publication of the new
notice in 2 newspapers,
subject to the publication of
the new notice in the second
newspaper is effected not
later than 15 days after the
publication of the new notice
in the first newspaper; or
(b) where the owner or occupier is not
known –
(i) affix the notice at the building
or wall;
(ii) cause publication of the
notice in 2 newspapers,
subject to the publication
of the notice in the second
Acts 2023 747
newspaper is effected not
later than 15 days after the
publication of the notice in
the first newspaper; and
(iii) serve a copy of the notice
to the Curator of Vacant
Estates under the Curatelle
Act, inviting him to confirm,
within 30 days of service,
whether the building has
been vested in him.
(3) The notice referred to in subsection (2)
shall –
(a) order the owner or occupier, not
later than such date as specified
therein, to pull down, secure or
repair the building or wall; and
(b) warn the owner or occupier that
failure to pull down, secure or
repair the building or wall by such
date as specified therein, the local
authority shall cause the building
or wall to be pulled down, secured
or repaired.
(4) Where an owner or occupier on whom
a notice has been served under this section fails
to comply with the notice, the local authority shall
pull down, secure or repair the building to the
satisfaction of the engineer who issued the report under
section 128(2).
(5) Where –
(a) pursuant to subsection (2)(a), the
owner or occupier fails to comply
with the new notice; or
748 Acts 2023
(b) pursuant to subsection (2)(b) –
(i) the owner or occupier fails to
comply with the notice; and
(ii) the Curator of Vacant Estates
confirms that the building
has not been vested in him;
or
(iii) the Curator of Vacant Estates
fails to reply to the local
authority within 30 days of
service of the notice,
the Authority shall, notwithstanding any other
enactment, cause the building or wall to be pulled
down, secured or repaired to the satisfaction of the
engineer who issued the report under section 128(2).
(6) Any person on whom a notice has been
served under this section fails to comply with the notice
shall commit an offence and shall, on conviction, be
liable to a fine not exceeding 500,000 rupees and to
imprisonment for a term not exceeding 5 years.
(7) No person shall be prosecuted for failing
to comply with a notice served on him under this
section as long as the delay granted in the notice has
not lapsed.