Construction Industry Authority Act 2023Section 50
50. Consequential amendments
(1) The Local Government Act is amended –
(a) in section 2, by inserting, in the appropriate alphabetical
order, the following new definition –
“ruinous building” means a building which –
(a) has become waste and ruinous;
(b) has become the receptacle for filth and other
nuisances;
(c) has become unsafe and unfit for use and
occupation;
(d) cannot be rebuilt or disposed of without the
consent of the owner; or
(e) is allowed to remain in a waste and ruinous or
unsafe state in consequence of the owner being
unable, unwilling or delaying to repair or pull
down the building;
Acts 2023 743
(b) in section 54(1)(a), by repealing subparagraph (ii) and
replacing it by the following subparagraph –
(ii) issue all orders required so
that this Act, the Construction
Industry Authority Act
2023, the Planning and
Development Act and the
Town and Country Planning
Act and are complied with;
(c) in section 117 –
(i) in subsection (3), by repealing paragraph (a) and
replacing it by the following paragraph –
(a) the Construction Industry
Authority Act 2023;
(ii) in subsection (4)(d), by deleting the words
“Building Control Act” and replacing them
by the words “Construction Industry Authority
Act 2023”;
(iii) in subsection (6), by deleting the words “Building
Control Act” and replacing them by the words
“Construction Industry Authority Act 2023”;
(d) in section 120, by adding the following new
subsection, the existing provision being numbered as
subsection (1) –
(2) No Building and Land Use Permit issued
for the division of a land shall lapse until the division
of the land has been carried out.
(e) in section 120C –
(i) in subsection (3), by deleting the words “an
applicant complies”, “the builder and developer
744 Acts 2023
pay” and “issue to the applicant” and replacing
them by the words “the holder of a Building and
Land Use Permit”, “he or the contractor pays”
and “issue to the holder of the Building and Land
Use Permit”, respectively;
(ii) in subsection (4) –
(A) in paragraph (a), by deleting the words
“an applicant” and replacing them by the
words “the holder of a Building and Land
Use Permit”;
(B) in paragraph (b), by deleting the words
“an applicant takes”, “the builder and
developer pay” and “section 21 of the
Building Control Act” and replacing
them by the words “the holder of a
Building and Land Use Permit”, “he or
the contractor pays” and “section 17 of
the Construction Industry Authority Act
2023”, respectively;
(C) in paragraph (c), by deleting the words
“an applicant” and replacing them by the
words “the holder of a Building and Land
Use Permit”;
(D) in paragraph (d), by deleting the words
“Any applicant” and replacing them by
the words “The holder of a Building and
Land Use Permit”;
(iii) by repealing subsection (8);
(f) by repealing section 127E;
Acts 2023 745
(g) by inserting, after Part VIII, the following new Part –
PART VIIIA – MAINTENANCE OF DANGEROUS,
RUINOUS AND HAZARDOUS BUILDINGS
Sub-Part A – Dangerous and Ruinous Buildings