Fifth Schedule, paragraph 1: Bagasse electricity production

FIFTH SCHEDULE

Sugar Industry Efficiency ActFifth Schedule, paragraph 1

1. Bagasse electricity production (a) Steam generating equipment including boilers operating at not less than 25 bars and associated auxiliaries intended to improve efficiency of the steam generating process; (b) bagasse drying; (c) storage and handling of bagasse; (d) (i) bagasse transport (ordinary); and (ii) bagasse transport (specialised); (e) steam saving prime-movers; (f) electrical power generating equipment with an inlet steam pressure of not less than 23 bars and a rated capacity of not less than 3 mega Watt intended for efficient operation of the factory and for the use of electrical prime-movers; (g) process steam-saving equipment such as— (i) heaters; and (ii) pre-evaporator or other device leading to intensive bleeding and steam economy; (h) other equipment leading to improved steam/energy balance.

consolidated text (as at 2017, amended since). juris shows the text as it was consolidated; it does not confirm that this is the law in force today.

Ask juris about this paragraph Official source