Section 11: Repairing tramways
consolidated text (as amended). juris shows the text as it was consolidated; it does not confirm that this is the law in force today.
11. Repairing tramways
(1) A promoter, for the purpose of making, forming, laying down, maintaining and renewing a tramway, may break up and open a public road,
subject to subsection (2).
(2) (a) The promoter shall give to the Permanent Secretary notice of his
intention, specifying the time at which he will begin to do so, and the portion
of road proposed to be opened or broken up, such notice to be given 7 days,
at least, before the commencement of the work.
(b) The Permanent Secretary may superintend such opening, breaking up, or altering the level of any road.
(c) The promoter shall pay to the Accountant-General all the expenses incurred by the Permanent Secretary on account of superintendence of
works under paragraph (b).
(d) (i) Where a tramway crosses a public road or carriageway, the
promoter shall set up gates or chains with a red disc, and place stop blocks
across the rails at a certain distance on each side of the road or carriageway
to be crossed, and no person shall open the stop blocks until gates across
the roads or carriageway have been closed, or the chains have been fixed
across the roads or carriageways.
(ii) Where a tramway runs along or on a public road, the promoters
shall set up, at each byroad where it opens out on to the public road where
the tramway passes, a gate which shall be closed when trains are running
along the tramway.
T17 – 3 [Issue 1]
Tramways Act
(e) The gates shall be 2 feet wider than the public road, and where
the crossing is a level crossing it shall be as nearly as possible at right angles.
(f) Except as provided in regulations, no person shall use a level
crossing between sunset and sunrise.
(g) (i) Solid masonry shall be laid to the exact level of the top of the
rails on each side of each road, and the road shall be kept in good repair by
the promoters.
(ii) The promoter may, instead of using masonry, lay, flush with the
road surface, a guard rail alongside the rails or may replace the rails by
grooved rails which shall also be laid flush with the road surface, or by such
other appliances as may be approved by the Minister.
(h) Where repairs to the crossings of the road are required, only one
half of the road shall be broken up at a time, and the other half shall not be
broken up until the first half is restored to circulation and public traffic.
(i) At each level crossing where the tramway is being used for traffic, the proprietor shall provide a gatekeeper to be in constant attendance.
(j) The Minister may exempt tramways worked exclusively by animal
power from the requirements of paragraphs (d), (e) and (i).