Section 120: Validity of Building and Land Use Permit

Local Government Act

This section is inserted by Act No 10 of 2018, section 5.

consolidated text (as at 2017, amended since). juris shows the text as it was consolidated; it does not confirm that this is the law in force today.

120. Validity of Building and Land Use Permit A Building and Land Use Permit shall lapse within 2 years from the date of issue of the permit unless any of the following works has been undertaken – (a) for works at ground level, the external walls of the building are raised to at least 600 millimetres above the floor slab; (b) for a vertical extension to an existing structure, the external walls of the building are raised to at least 600 millimetres above the floor slab of the lower floor; (c) for a building with basement, the external walls are raised to at least 600 millimetres above the poured slab of the ground floor above; (d) for a timber construction, 20 per cent of the framing structure on the level where construction is being undertaken is lifted and standing; (e) for a steel construction, 20 per cent of the steel framing structure on the level where construction is being undertaken is lifted and standing; (f) the surrounding excavation of foundations are backfilled to avoid water ponds; or (g) such other works as may be prescribed. 210 Acts 2018 (iii) by inserting, after section 120, the following new sections –

Ask juris about this section Official source

Questions this section answers